What is a measured survey? It involves taking measurements of sites or buildings in order to help your architect produce accurate drawings to scale. They are specified to an agreed level of detail and costs vary on size of survey

How long does it take?

  • A measure survey will usually take 1-6 hours, dependent on the size of the property.
  • It will usually take an architect 5+ working days to complete an existing set of drawings from the survey. Usually includes:
    • Floor Plans
    • Elevations
    • Cross sections
    • Roof plan
    • Site plan: The location of buildinsg in relation to boundaries.

 

What are the benefits of a measured survey?

Getting a measured survey has a range of benefits.

  • Accurate drawings of your property are essential, as they form the basis of your future scheme and designs.
  • Incorrect drawings may lead to planning permission being denied.
  • Professional quality drawings will help speed up the process as your architect will be working off accurate measurements.

 

How much does a survey cost?

You can expect to pay £200-£500+, depending on your location and size of building.

Find a surveyor near me

Contact Us for further advice